svpcet-logo

Laboratory Facilities

S.No. Name of the Laboratory Name of the Important Equipments
1
EEE LAB-1
(Electrical Machines Laboratory-I)
DC Compound Motor, DCShunt Motor, DC Series Motor Coupled With DCSeries Generator, DC Shunt Motor Generator Set, DC Shunt Motor Coupled Compound DC Generator Set, Load Banks, Ammeters, Voltmeters, Watt Meters, Resistive Loads
2
EEE LAB-2
(Power Electronics Lab)
CRO,RPS, A.C Voltage Controller Kit, Single Phase Half Controlled Bridge Rectifier Circuit Kit, Single Phase Fully Controlled Bridge Rectifier Circuit Kit, Forced Commutation Circuit Kit, Dc Jones Chopper Kit, Cyclo converter Kit, Series Inverter Kit, Dual Converter Kit, Single Phase Firing Unit, Step-Down Transformer , Parallel Inverter, Characteristics Of SCR, MOSFET,IGBT, Gate Firing Circuit
3
EEE LAB-3
(Electrical Machines Laboratory-II)
3-Phase Squirrel Cage Motor, 1-Phase Squirrel Cage Motor, 3-Phase Auto Transformer , Three Phase Synchronous Motor, 3-Phase Alternator, 3-Phase Squirrel Cage Motors, 3-Phase Slip Ring Induction Motor, Resistive Load Bank, Auto Transform, 3KVA, 1-Phase Transformer, 2KVA 1-4 Transformer, 3-Phase R-Load, 2KVA – Transformer, Variable Resistance Box, Direct-On-Line Starter.
4
EEE LAB-4
(Control Systems & Simulation (I&II) Laboratory)
Function Generator, Synchro Test Panel, Second order system, Temperature controller, PLC Simulator Software, Magnetic Amplifier Test Setup, Transfer Function of DC Motor, PID Controller, Lead lag Compensator, MATLAB Software.
5
EEE LAB-5
(Measurements &Instrumentation Laboratory)
Phantom Load Set-up, Dynamometer Power Factor Meter, Kelvin's Double Bridge, Schering Bridge, Anderson Bridge, Single-Phase Wattmeter, choke Coil Parameter, Measurement Setup, Low Power Factor (LPF) Wattmeter, Two Watt Meter Method Setup for 3-Phase Power Measurement, Optical Bench, H.T. Testing Kit for Dielectric Oil Testing, LVDT and Capacitance Pickup Setup, Resistance Strain Gauge Setup, Transformer Turns Ratio Measurement Setup.
EEE LAB-6
(Power System Lab)
Over Voltage Relay, Over Current Relay, Fault Simulator Panel, 3-Phase Source Panel, Fault Analysis simulator, Negative Sequence Relay, Static over & Under Voltage Relay, Ammeter,Voltmeter.
EEE LAB-7
(Electrical Circuits Lab)
RPS, CRO, Multimeter, Bread Board, Function Generator, Pulse generator, Decade Resistance Box, Decade inductance Box, Decade Capacitance Box, Thevenin’s Theorem kit, Norton’s Theorem kit, Super position Theorem kit, Reciprocity Theorem kit, Z-Y parameter Kit.